- Construction of a 40m long bridge over an existing creek which includes steel pipes, concrete abutments, a pre-stressed concrete box girder structure, and associated concrete decking.
- 500m of new roadways including earthworks, sidewalks, and asphalt pavement.
- Underground utilities including watermain, sanitary, and storm sewers.
- 3rd party utility installations and streetlighting.

Apex Corridor Segments 2 to 4
Project Includes: