Apex Corridor Segments 2 to 4

Project Includes:

  • Construction of a 40m long bridge over an existing creek which includes steel pipes, concrete abutments, a pre-stressed concrete box girder structure, and associated concrete decking.
  • 500m of new roadways including earthworks, sidewalks, and asphalt pavement.
  • Underground utilities including watermain, sanitary, and storm sewers.
  • 3rd party utility installations and streetlighting.

Project Details

Location

North Vancouver, BC

Date of Construction

2024 - 2025