- Permanent fill and preload construction consisting of over 95,000m3 of material imported, along with preload removal following the achievement of required settlement.
- Site remediation consisting of contaminated soils and hog fuel removal.
- Installation of settlement monitoring points, construction of concrete lock block walls, and management of erosion and sediment control.