- Excavation and shoring to facilitate the construction of a basement level of up to 9 m below existing grade for a new 267,000 square foot building.
- Over 35,000 m3 bulk excavation with shotcrete shoring and tie-back anchors.
- Detailed excavation for foundations, mechanical and electrical trenching.
![](https://cdn.sanity.io/images/6akcenf7/production/8523fa5c631153bfb7906712c0b288271bd251f6-1313x875.png?auto=format)