- 30,000 m3 bulk excavation for a 36-storey residential tower.
- Cutter Soil Mixing (CSM) shoring wall with solid bar, hollow bar, and strand tie-back anchors.
- Detailed excavation for foundation, mechanical and electrical scopes.
- Slab preparation and foundation backfilling.

Agnes
Project Includes:
Gallery
Related Projects
Dedicated to the job at hand, Conwest gets it done.