- Excavation and shoring for a new 46-storey high rise residential tower which includes 3 level of below grade parking.
- Over 61,000 m3 bulk excavation with shotcrete shoring and tie-back anchors.
- Detailed excavation for foundations, mechanical and electrical trenching.